  • 10-11-2025 — Site Visit — M/315 MBZC

    Engineer Adeel Arif reports MBZC Plot 315 Block Work is 60% done. Focus on crack prevention using steel mesh at column joints and waterproof sheets on the First Floor slab. Work is slowed by a temporary block shortage in Fujairah.

  • 02-11-2025 — Site Visit — M/315 MBZC

    Engineer Adeel Arif reports solid construction progress at MBZC Plot 315. Ground Floor Block Work is complete, and First Floor Block Work is advancing. Directive issued to accelerate block work construction speed to maintain project flow and meet deadlines in Fujairah.