Professional site inspection report detailing the final handover readiness for Villa H-1311 in MBZC. This technical review covers the successful final inspection, pending FEWA electrical utility coordination, and owner-scoped finishing details. Essential documentation for the final completion stages of high-end villa construction in UAE.
Site inspection for Project H-1311 in MBZC, Fujairah, confirming the completion of interior ceramic, painting, and joinery works. The report details the remaining requirements for bathroom fittings, PPR plumbing, and handrail installation to finalize the project for handover.
Engineer Adeel Arif reports rapid progress at MBZC Villa H-1311. Ceramic fixing is 80% complete and outside paint works are underway. With kitchen decor and final electric and plumbing works in progress at great speed, the villa is nearing its final finishing stages in Fujairah.
Site update for MBZC Villa H-1311: Exterior painting has commenced alongside floor tile preparation and MEP progress. Engineer Adeel Arif has issued technical instructions regarding outer wall plaster alignment and crack repairs to ensure a premium finish for the final Jotun/Grafi Decor application.
Engineer Adeel Arif reports MBZC Villa H-1311 is nearing closure. Boundary Wall structure is complete and plastering is active. Windows Fitting, Roof Finishing Work, and final Electric Remaining Works are all in progress as the villa moves towards handover.