Project Tag: Block H, Plot 1311 – Location: Mohamed Bin Zayed City


  • 31-05-2026 — Site Visit — H/1311 MBZC

    Site inspection for Project H-1311 in MBZC, Fujairah, confirming the completion of interior ceramic, painting, and joinery works. The report details the remaining requirements for bathroom fittings, PPR plumbing, and handrail installation to finalize the project for handover.

  • 14-01-2026 — Site Visit — H/1311 MBZC

    Engineer Adeel Arif reports rapid progress at MBZC Villa H-1311. Ceramic fixing is 80% complete and outside paint works are underway. With kitchen decor and final electric and plumbing works in progress at great speed, the villa is nearing its final finishing stages in Fujairah.

  • 28-12-2025 — Site Visit — H/1311 MBZC

    Site update for MBZC Villa H-1311: Exterior painting has commenced alongside floor tile preparation and MEP progress. Engineer Adeel Arif has issued technical instructions regarding outer wall plaster alignment and crack repairs to ensure a premium finish for the final Jotun/Grafi Decor application.

  • 14-12-2025 — Site Visit — H/1311 MBZC

    Engineer Adeel Arif reports MBZC Villa H-1311 is nearing closure. Boundary Wall structure is complete and plastering is active. Windows Fitting, Roof Finishing Work, and final Electric Remaining Works are all in progress as the villa moves towards handover.

  • 23-11-2025 — Site Visit — H/1311 MBZC

    Engineer Adeel Arif reports rapid progress at MBZC Villa H-1311. Compound Wall beam casting and electric pipe work are ongoing alongside intensive plumbing and waterproof works. Ceramic works and decor plaster are advancing rapidly in Fujairah.