Project Tag: Block G, Plot 549 – Location: Mohamed Bin Zayed City


  • 24-11-2025 — Site Visit — G/549 MBZC

    Engineer Adeel Arif reports rapid progress at MBZC Villa G-549. Manhole works, Plumbing, and Electrical Works are ongoing, and all required materials have arrived. The site is aggressively preparing the external walls for the Owner’s scheduled Stone Works commencement in Fujairah.

  • 08-11-2025 — Site Visit — G/549 MBZC

    Engineer Adeel Arif reports from MBZC Plot 549, Fujairah. Boundary Wall backfilling and Wall Insulation works are progressing. Ceramic and Boundary Wall blocks procurement is underway, but Manhole construction is stopped pending owner design changes.