SITE VISIT REPORT: NATURAL SUBGRADE COMPACTION & TESTING

Project Name: Proposed Villa Location: A/420 Ghizmri Farfar, Fujairah Date of Visit: October 28, 2025 Time of Visit: 10:00 AM Report Prepared By: Engineer Adeel Arif (Site Engineer)

____________

I. Purpose of Visit:

To verify the preparedness of the foundation subgrade (natural soil) following final compaction and to initiate the official Fujairah Municipality (FM) inspection process for geotechnical approval.

II. Observations & Geotechnical Readiness:

The site visit confirmed the following critical preparations for the foundation stage:

  • Soil Treatment and Compaction: The natural subgrade below the proposed villa foundation level has been correctly treated, watered, and compacted using heavy rollers.
  • Natural Density Test: The required preliminary Natural Density Test has been applied to the compacted soil layer. Results show that the achieved compaction meets the necessary project specifications for stability and settlement criteria.
  • Testing Application: The compacted site is now ready for the official Fujairah Municipality (FM) Geotechnical Inspection, including the field Density Test and verification of the corresponding laboratory-derived Proctor Test (BS 1377-2) results.
  • Site Compliance:
    • The perimeter fence has been fully erected, securing the work area.
    • A proper signboard is correctly displayed at the site entrance, ensuring full adherence to all local Fujairah regulations.

III. Actions Taken & Next Steps:

  • FM Inspection Application: The formal application has been submitted to the Fujairah Municipality for the official geotechnical tests (Density and Proctor) on the compacted natural subgrade.
  • Documentation Ready: All related documents, including the Proctor Test results from the approved laboratory and the field density measurements, are prepared for immediate submission to the FM Engineer upon arrival.
  • Continuation: Site operations are currently on hold for foundation excavation until the official FM approval for the foundation base is secured.

IV. Concluding Remarks:

The site at A/420 Ghizmri Farfar, Fujairah, is structurally compliant, securely fenced, and the soil compaction for the foundation subgrade has been successfully completed. We anticipate a swift inspection and approval from the Fujairah Municipality to proceed rapidly to the next critical stage of the foundation works.